Motor Installation
Well the motor installation went without a hitch. Tamera operated the engine lift and dropped it in the first time. After hashing out a few design ideas we settled and I notched out a semi circle in the motor's cross member then reinforced the bottom. I built the top motor mount that holds the motor in place and will also hold the electric components after I build a flat platform for them to mount on.
After we finished the install and the motor was secured I talked Tamera into taking a test roll out. hehe